Automation Task:
Station control system as part of the project for the reduction of supply recovery times on the 10kV level.
Scope:
Telecontrol system: ControlExpert
No. of RTUs: ca. 350 RTUs at different telecontrol nodes
No. of data elements: 10 ,000
Protocols: IEC 870-5-101; IEC 870-5-104
Remarks/Special features:
Connection to the NetTrans control centre by Siemens via the Vattenfall-owned digital network